10. Maintenance activities. .
Please note: turn off the gas supply and power supply as much as possible during maintenance activities.
Maintenance activities should be performed by a qualified fitter.
Close the gas tap while maintenance activities are being performed.
Inspect
Work activities OK
1 General inspection a The main burner should ignite smoothly (within several seconds) and not give a bang sound due to
delayed ignition. Go to number 7 if there appears to be delayed ignition.
b Check the flame image. No flames against the glass. The flame image should be stable.
The flame should be yellow after approximately 15 minutes; go to number 7 if the flame image is
blue.
c Check for excessive formation of soot on the inside of the glass/combustion chamber and on decora-
tive parts.
Go to number 7 if there is excessive formation of soot.
2 Door/front a check for obstructions in the convection air openings
3 Glass window, seal. a check the glass window for cracks etc. Replace if damaged, cracked, or broken.
b check the seal of the glass window; this needs to join the unit and glass window. Replace if required.
c check any hinges, seals, quadrants etc.
d clean the glass. Check there is an even (not too large) load on the glass window. Prevent point load.
4 Gas control compart-
ment and convection
part of the unit
a clean these areas with a vacuum cleaner. Do so carefully. Remove parts that do not belong here.
b check if the convection airflow is free.
5
a remove decorative parts and clean the burner (be careful with ceramic burners!) with a vacuum
cleaner.
Decorative parts (logs/
pebbles etc.) and
(pilot) burner
b inspect decorative parts for damage/cracks/discolouration and clean with a soft brush if required.
c check if the burner cover is intact and free of corrosion. Replace the burner if required.
d after completing the inspection: replace decorative parts, exactly as stipulated by the manufacturer.
Ensure the pilot burner is kept free!
e check if the pilot flame protection is intact (if applicable).
f check the piezo for sufficient spark power, and ensure the ignition cable is free from metal parts/
electrical parts.
6 Combustion chamber a check the condition of the finishing, such as varnish and enamel. Check for corrosion. Repair if re-
quired.
b
replace the unit if there are holes. Close the unit for further use.
c check overpressure hatches or overpressure construction for sealing and sufficient movement/deposits.
7 Ignition and operation
of the main burner
a remove the burner from the unit and check whether the main injector is dirt-free.
b check if the primary ventilation opening in the main burner is dirt-free.
c mount the burner and check if the burner is in a good position in relation to the pilot burner.
d check if the burner is fixed and cannot move.
e check if the pilot burner burns well, with a blue flame (blue only).
f check if the burner ignites uniformly across the entire surface and without significant delay.
g check if the flame image is uniform and stable.
h check the initial and burner pressure. Do not forget to close the pressure measuring points.
i check if gas control parts are intact, and that plastic parts have not melted, for example.
j check electrical wiring for damage and ensure they are away from hot parts of the unit.
8 Installation a
check if convection grates are dust-free and dirt-free.
b check if there is sufficient distance between the unit and flammable furniture.
9 Flue tube/air supply a where possible, inspect the general state of the exhaust/supply system and check for blockages /
leaks / corrosion.
b check the outlet, which should be free from dirt and blockages.
c check the outlet, which should be free from dirt and blockages.
10 Remote control a check for correct functioning of the remote control.
11 Ventilators (if present) a clean the convection ventilators and check for correct functioning.
22

Brauchen Sie Hilfe? Stellen Sie Ihre Frage.

Forenregeln

Missbrauch melden von Frage und/oder Antwort

Libble nimmt den Missbrauch seiner Dienste sehr ernst. Wir setzen uns dafür ein, derartige Missbrauchsfälle gemäß den Gesetzen Ihres Heimatlandes zu behandeln. Wenn Sie eine Meldung übermitteln, überprüfen wir Ihre Informationen und ergreifen entsprechende Maßnahmen. Wir melden uns nur dann wieder bei Ihnen, wenn wir weitere Einzelheiten wissen müssen oder weitere Informationen für Sie haben.

Art des Missbrauchs:

Zum Beispiel antisemitische Inhalte, rassistische Inhalte oder Material, das zu einer Gewalttat führen könnte.

Beispielsweise eine Kreditkartennummer, persönliche Identifikationsnummer oder unveröffentlichte Privatadresse. Beachten Sie, dass E-Mail-Adressen und der vollständige Name nicht als private Informationen angesehen werden.

Forenregeln

Um zu sinnvolle Fragen zu kommen halten Sie sich bitte an folgende Spielregeln:

Neu registrieren

Registrieren auf E - Mails für Thermocet Trimline 140 -1039 wenn:


Sie erhalten eine E-Mail, um sich für eine oder beide Optionen anzumelden.


Das Handbuch wird per E-Mail gesendet. Überprüfen Sie ihre E-Mail.

Wenn Sie innerhalb von 15 Minuten keine E-Mail mit dem Handbuch erhalten haben, kann es sein, dass Sie eine falsche E-Mail-Adresse eingegeben haben oder dass Ihr ISP eine maximale Größe eingestellt hat, um E-Mails zu erhalten, die kleiner als die Größe des Handbuchs sind.

Ihre Frage wurde zu diesem Forum hinzugefügt

Möchten Sie eine E-Mail erhalten, wenn neue Antworten und Fragen veröffentlicht werden? Geben Sie bitte Ihre Email-Adresse ein.



Info