Ensure that the fuel supplied to the unit is clean and free from particles and moisture.
Before a gas supply pipe (new or existing) is connected to the main gas pipe at the gas meter and to
the gas control block of the unit, clean and dry compressed air should been blown through it.
Cut copper pipes as well as aluminium pilot pipes must be deburred and blown clean before they
are connected. The dust filter at the connection to the gas control block will only filter out the
coarsest dirt from the system. Fine particles are still able to reach the inside and may damage and/or
adversely affect regulation in the gas control block .
Heat, moisture and dust are a threat to all electronic components
Protect the electronic gas control
until
all construction, plastering and paintwork has been completed.
If such work cannot be avoided, then protect the control against dirt and moisture penetration by using,
for example, plastic film .
Only place the batteries
after
wiring to the receiver, gas control block and pilot set is connected.
Premature connection to the energy source may damage the control’s CPU (central processor).
Ensure that the ignition cable is not near the antenna wire and that they do not cross each other.
The high voltage released at ignition may damage the sensitive receiver circuit.
This may mean that the unit becomes less responsive or not responsive at all to handset commands.
Extend the supplied thermocouple with just the original extension. (available from your supplier)
Unauthorized extension of the thermocouple has the effect of stress reduction, thereby
the magnetic coil can not be activated.
Prevent leakage of the ignition spark to other parts of the installation than the Ignition by the pilot
Keep the ignition free of hull or other metal parts. If cable extension is used, see to it that connections are
additionally insulated with silicone grommet.
For automatic start via the transmitter, the receiver and the control the gas control valve to
be switched
The oval disk on the gas control block should be turned to the ON position. The I/0 switch should
to be set to "I". The ignition must be connected to the receiver box at the terminal SPARK.
The transmitter's contains the thermostat sensor system
The transmitter operates best at 2 to 3 m from the unit. Although the communication via short wave radio
signals takes place, it is recommended that the transmitter in the 'visibility' of to lay the gas apparatus in
a place where the user wants to experience a pleasant temperature. Place the hand transmitter in direct
sunlight or other hot places. The thermostat measures the temperature and regulates the flame size of the
gas in accordance.
Remove batteries only with the red ribbon which is under the battery, not with metal tool
Removing batteries with a metal object, the electronic control can permanently damage.
6. INSTRUCTIONS FOR MERTIK MAXITROL GV60 GASCONTROL
Electronic components will become permanently faulty when exposed to temperatures higher than 60°C.
Standard AA batteries will crack open at temperatures >54°C and the battery contents will damage the
electronic switches located underneath. Batteries last longest at <25°C. At >50°C the life span is around
23 weeks, this makes the use of the gas fire unnecessarily expensive.
Only install the gas control block and receiver as pre-installed at the factory
Remember that components may have to be replaced or that repairs may have to be performed at a later date.
This may be more difficult if the control is installed using a method that is different from the instructions
provided here.
WARNING
Do not tighten the contact breaker and the thermocouple connection too tightly on the gas control
block or to each other. It is sufficient to tighten by hand and add a half a turn with an open-end spanner.
Tightening too much will break the connection to the magnetic coil below and/or the insulation around
the aluminium contact pin in the contact breaker. This may lead to the magnetic coil not opening the gas
supply to the pilot and the unit not working.
NOTICE
WARNING
It is forbidden to start up the unit if window (s) is not present or broken!
NOTICE
Waiting time of 5 minutes between each starting attempt
9

Brauchen Sie Hilfe? Stellen Sie Ihre Frage.

Forenregeln

Missbrauch melden von Frage und/oder Antwort

Libble nimmt den Missbrauch seiner Dienste sehr ernst. Wir setzen uns dafür ein, derartige Missbrauchsfälle gemäß den Gesetzen Ihres Heimatlandes zu behandeln. Wenn Sie eine Meldung übermitteln, überprüfen wir Ihre Informationen und ergreifen entsprechende Maßnahmen. Wir melden uns nur dann wieder bei Ihnen, wenn wir weitere Einzelheiten wissen müssen oder weitere Informationen für Sie haben.

Art des Missbrauchs:

Zum Beispiel antisemitische Inhalte, rassistische Inhalte oder Material, das zu einer Gewalttat führen könnte.

Beispielsweise eine Kreditkartennummer, persönliche Identifikationsnummer oder unveröffentlichte Privatadresse. Beachten Sie, dass E-Mail-Adressen und der vollständige Name nicht als private Informationen angesehen werden.

Forenregeln

Um zu sinnvolle Fragen zu kommen halten Sie sich bitte an folgende Spielregeln:

Neu registrieren

Registrieren auf E - Mails für Thermocet Trimline 140 DB Tunnel - 1149 wenn:


Sie erhalten eine E-Mail, um sich für eine oder beide Optionen anzumelden.


Andere Handbücher von Thermocet Trimline 140 DB Tunnel - 1149

Thermocet Trimline 140 DB Tunnel - 1149 Installationsanweisung - Holländisch - 27 seiten


Das Handbuch wird per E-Mail gesendet. Überprüfen Sie ihre E-Mail.

Wenn Sie innerhalb von 15 Minuten keine E-Mail mit dem Handbuch erhalten haben, kann es sein, dass Sie eine falsche E-Mail-Adresse eingegeben haben oder dass Ihr ISP eine maximale Größe eingestellt hat, um E-Mails zu erhalten, die kleiner als die Größe des Handbuchs sind.

Ihre Frage wurde zu diesem Forum hinzugefügt

Möchten Sie eine E-Mail erhalten, wenn neue Antworten und Fragen veröffentlicht werden? Geben Sie bitte Ihre Email-Adresse ein.



Info