532677
11
Zoom out
Zoom in
Vorherige Seite
1/54
Nächste Seite
Page.11
7. CONCENTRIC FLUE SYSTEM CC (See Page 33, 34, 35)
The concentric flue system consists of a 100mm or 130mm Ø inner flue concentric with a 150 mm or 200 mm Ø
outer flue. These flues have been set up concentrically; the combustion gases are exhausted through the internal flue
while the fresh combustion air is supplied between the internal and external flues.
7.1 Components of the concentric flue system. (See page 33, 34, 35)
Different connections are possible using the concentric flue system. These are:
Through the roof face and through the exterior wall.
There are various options for mounting the pathway for this system,
however, there are a few important requirements/conditions:
* The maximum allowable vertical flue length is 12 metres (the sum of the flue length and the calculation
lengths for the bends).
* 90° bends have a 2-metre horizontal calculation length.
* 45° bends have a 1-metre horizontal calculation length.
* The outlet can be installed at any point on the roof face or exterior wall (supply and discharge in an identical
pressure area), but must meet applicable regulations.
* Duct pathways may not be insulated
Important
* Ensure the restriction plate is mounted in the correct manner, as indicated in these instructions.
* The correct restriction plate will provide the unit with the most optimal efficiency, flame image and
combustion.
* Mounting an incorrectly placed restriction plate may cause malfunction of the unit.
7.2 Construction of concentric flue system CC
Indirect wall connection.
* The outlet may also be installed above the exhaust in the wall, taking any hindrance to the surrounding area
into consideration, according to national, regional, local standards and regulations. Ensure wind pressure on
the flue terminal is not too extreme, such as a balcony, flat roof, corners and in small alleys etc., as this may
negatively influence the unit efficiency.
* Provide a recess in the exterior wall of around 155 mm for concentric 100-150, and 205 mm for concentric
130-200. (in a flammable wall ensure there is 50 mm of extra space around the outer pipe and use
fireproof casing) and fix the exterior wall duct with the wall plate to the outer side of the wall. The wall plate
of the exterior wall duct must be sealed sufficiently against the wall on the outside, to avoid moisture and/or
flue gas leaks into the living space.
* The flue should be cased if necessary. Sufficient fireproof measures must also be taken when the flue is being
mounted along flammable materials.
* Determine the position of the unit and outlet and begin construction of the flue with the connection on the unit,
paying attention to the direction of installation and connecting the elements by means of clamp strips.
* The fitted pipe can be used between the bends or when connecting to the unit.
If necessary, use wall brackets to support the flue
Mounting using the roof pass-through option
* The flue terminal can be located at any random place on the roof face (supply and exhaust in identical pressure
areas) and must meet the applicable rules and regulations.
* A roofing sheet for a flat roof or a roofing sheet lead for sloping tiled roofs can be used for a watertight duct.
Use various bends for the slope, if required. The recess in the roof decking should be 5 cm larger all
around, to ensure sufficient fire resistance.
* One needs to take into account the regulation regarding fire resistance between rooms (See national, regional,
local standards and regulations). A casing made of fireproof material (e.g. 12 mm Promatect fire resistant
plate) must be used at 25mm from the outside duct.
* Determine the position of the unit and outlet and begin construction of the flue with the connection on the unit
(always 1 metre vertical first), paying attention to the direction of installation! The inner flue must be installed
for draining purposes. Connect the elements by using clamping strips. Ensure the gas tightness of all
connections is correct.
* A fitted pipe can be used between the bends or when making the connection to the unit and/or the roof pass-
through. Use 2 wall brackets to support the flue on each floor.
11

Brauchen Sie Hilfe? Stellen Sie Ihre Frage.

Forenregeln

Missbrauch melden von Frage und/oder Antwort

Libble nimmt den Missbrauch seiner Dienste sehr ernst. Wir setzen uns dafür ein, derartige Missbrauchsfälle gemäß den Gesetzen Ihres Heimatlandes zu behandeln. Wenn Sie eine Meldung übermitteln, überprüfen wir Ihre Informationen und ergreifen entsprechende Maßnahmen. Wir melden uns nur dann wieder bei Ihnen, wenn wir weitere Einzelheiten wissen müssen oder weitere Informationen für Sie haben.

Art des Missbrauchs:

Zum Beispiel antisemitische Inhalte, rassistische Inhalte oder Material, das zu einer Gewalttat führen könnte.

Beispielsweise eine Kreditkartennummer, persönliche Identifikationsnummer oder unveröffentlichte Privatadresse. Beachten Sie, dass E-Mail-Adressen und der vollständige Name nicht als private Informationen angesehen werden.

Forenregeln

Um zu sinnvolle Fragen zu kommen halten Sie sich bitte an folgende Spielregeln:

Neu registrieren

Registrieren auf E - Mails für Thermocet Trimline 63 wenn:


Sie erhalten eine E-Mail, um sich für eine oder beide Optionen anzumelden.


Andere Handbücher von Thermocet Trimline 63

Thermocet Trimline 63 Bedienungsanleitung und Installationsanweisung - Holländisch - 39 seiten


Das Handbuch wird per E-Mail gesendet. Überprüfen Sie ihre E-Mail.

Wenn Sie innerhalb von 15 Minuten keine E-Mail mit dem Handbuch erhalten haben, kann es sein, dass Sie eine falsche E-Mail-Adresse eingegeben haben oder dass Ihr ISP eine maximale Größe eingestellt hat, um E-Mails zu erhalten, die kleiner als die Größe des Handbuchs sind.

Ihre Frage wurde zu diesem Forum hinzugefügt

Möchten Sie eine E-Mail erhalten, wenn neue Antworten und Fragen veröffentlicht werden? Geben Sie bitte Ihre Email-Adresse ein.



Info