489381
5
Zoom out
Zoom in
Vorherige Seite
1/24
Nächste Seite
5
Installation instructions
Installation and repair are only to be carried out by an
expert. Always read and follow the operating instructions
carefully prior to starting any work!
The year when the equipment was first taken into oper-
ation must be indicated with a check on the type plate.
Choice of location and installation
Select installation site (not in installation compartment behind
heater) such that the hot water pipes are as short as possible.
The boiler must be easily accessible at all times for service
work and be easy to remove and install.
Securely screw boiler to suitable surface (plywood panel,
laminated wood strips, or metal base) on floor of vehicle with
B 5.5 x 70 screws and washers (1). Always use the support
sleeves (2) that are preinstalled in the factory to reinforce the
insulating jacket.
Water connection
All pressure and submergible pumps up to 2.8 bar are used
for operating the boiler and all mixed combination sets with or
without an electrical switch.
Fig. A
When using immersion pumps, a non-return valve (3 – not
included in the scope of supply) must be fitted between the
pump and the first branch point (arrow points in direction of
flow).
Fig. B
When using pressure pumps with high switching hysteresis,
hot water may flow back through the cold water tap. To pre-
vent the backflow, we recommend that a non-return valve
(4 – not included in the scope of supply) be fitted between the
outlet to the hot water tap and the drain valve.
Hoses with an inner diameter of 10 mm that are pressure-re-
sistant (up to 3.5 bar) and hot water-resistant must be used for
connecting to the boiler and the safety/drain valve.
For non-flexible pipe routing (e.g. John Guest System) Truma
can supply the water connections (5 + 6), the safety/drain
valve (7) and a non-return valve (3 + 4) with a 12 mm diameter
inner connection as accessories.
If connecting to a central water supply (rural or city connec-
tion) or when using more powerful pumps, a pressure reducer
must be used which prevents pressures of greater than 2.8 bar
occurring in the boiler.
Route the water hoses so that they are as short and
free of kinks as possible. All hose connections must be
secured using hose clamps (also for cold water)! Pressures
of up to 3.5 bar can occur in the safety/drain valve (also in
submergible pumps) because of the heat of the water and the
resulting expansion.
We recommend the use of hose clips (part no. 40712-01)
to fasten the hoses to walls or the floor. If gas heating
has been installed, the water hoses and the hose clips can be
laid on the hot air pipes, which prevents frost.
In order to guarantee that the boiler is completely emp-
ty, the enclosed elbow with breather valve (5) must be
used for the hot water connection!
All water pipes should be routed in a descending man-
ner to the safety/drain valve! There shall be no claims
under guarantee for damage caused by frost!
Elektroboiler (Electric boiler)
17
14
5
6
16
8
7
24
1
2
20
3
9
17
14
5
6
16
8
7
9
4
24
20
1
2
A
B
5

Brauchen Sie Hilfe? Stellen Sie Ihre Frage.

Forenregeln

Missbrauch melden von Frage und/oder Antwort

Libble nimmt den Missbrauch seiner Dienste sehr ernst. Wir setzen uns dafür ein, derartige Missbrauchsfälle gemäß den Gesetzen Ihres Heimatlandes zu behandeln. Wenn Sie eine Meldung übermitteln, überprüfen wir Ihre Informationen und ergreifen entsprechende Maßnahmen. Wir melden uns nur dann wieder bei Ihnen, wenn wir weitere Einzelheiten wissen müssen oder weitere Informationen für Sie haben.

Art des Missbrauchs:

Zum Beispiel antisemitische Inhalte, rassistische Inhalte oder Material, das zu einer Gewalttat führen könnte.

Beispielsweise eine Kreditkartennummer, persönliche Identifikationsnummer oder unveröffentlichte Privatadresse. Beachten Sie, dass E-Mail-Adressen und der vollständige Name nicht als private Informationen angesehen werden.

Forenregeln

Um zu sinnvolle Fragen zu kommen halten Sie sich bitte an folgende Spielregeln:

Neu registrieren

Registrieren auf E - Mails für Truma Elektroboiler wenn:


Sie erhalten eine E-Mail, um sich für eine oder beide Optionen anzumelden.


Andere Handbücher von Truma Elektroboiler

Truma Elektroboiler Bedienungsanleitung - Deutsch, Englisch, Holländisch, Dänisch, Französisch, Italienisch, Spanisch - 24 seiten


Das Handbuch wird per E-Mail gesendet. Überprüfen Sie ihre E-Mail.

Wenn Sie innerhalb von 15 Minuten keine E-Mail mit dem Handbuch erhalten haben, kann es sein, dass Sie eine falsche E-Mail-Adresse eingegeben haben oder dass Ihr ISP eine maximale Größe eingestellt hat, um E-Mails zu erhalten, die kleiner als die Größe des Handbuchs sind.

Ihre Frage wurde zu diesem Forum hinzugefügt

Möchten Sie eine E-Mail erhalten, wenn neue Antworten und Fragen veröffentlicht werden? Geben Sie bitte Ihre Email-Adresse ein.



Info