694450
3
Zoom out
Zoom in
Vorherige Seite
1/34
Nächste Seite
3
Information
Keep this manual so that it is accessible to professionals and future needs.
Read this manual carefully before putting the pellet burner into service.
• Follow the manual and its instructions carefully and do recommended management and maintenance.
Registration to the local building authority in your municipality
N.B.: At every change of heating system, the local building authority of the municipality has to be contacted
and a so called “Construction Registration” is made.
Inspection
Heating plants installed today shall be inspected and approved by authorized inspector like the local certified
chimney-sweeper. The local building authority in the municipality can inform you how this could work.
Important at installation
Run the feed auger of the burner by itself until the pellets start to come in constant flow. This can be made
by connecting the feed cable of the burner directly to the cable of the auger. Run the auger approx. 15min
after the first pellets have reached the outlet on the auger.
The auger shall have a max angle 45 degrees and not be below 43 degrees.
We recommend that the length of the hose, between the burner and the auger, should not be below
500mm. The auger shall also be placed so that it sits a little to the side of the tipping chute of the burner,
this to avoid that pellets can fall down into the burner if back burning would occur when the hose burns off
as a part of the safety.
• Hose inclination must be more than 45 degrees, otherwise the pellets are stuck in the hose.
At adjustment of the burner, the draft limiter should be adjusted after the draft conditions of the chimney.
The feed cable of the burner shall be connected above the overheating protection of the boiler.
Sweeping
Chimney sweeping shall in accordance with the fire-protection law shall be made frequently during the year.
This is made by your local chimney sweeper. Regular cleaning of heating surface of the boiler shall be made
in a way so that good operating economy is obtained. Prepare sweeping by turning off the boiler at least a
couple of hours before cleaning to minimize the amount of glowing ash.
Warning!
See to that the power to the boiler is turned off before the cover over the burner is removed and dismount
cabling to the burner when the burner is removed from the boiler.
Maintenance agreement increases operation length and life of the burner
ULMA AB recommends subscription of annual maintenance agreement.
For more information contact your local ULMA retailer.
Change of wear parts
ULMA AB always recommends that wear parts, when needed, are being changed by an authorized service
technician at your ULMA retailer. Ulma’s retailers can provide necessary spare parts and at change make
sure that the parts being changed on the unit go through alignment and that a flue-gas analysis of the unit is
made.
3

Brauchen Sie Hilfe? Stellen Sie Ihre Frage.

Forenregeln

Missbrauch melden von Frage und/oder Antwort

Libble nimmt den Missbrauch seiner Dienste sehr ernst. Wir setzen uns dafür ein, derartige Missbrauchsfälle gemäß den Gesetzen Ihres Heimatlandes zu behandeln. Wenn Sie eine Meldung übermitteln, überprüfen wir Ihre Informationen und ergreifen entsprechende Maßnahmen. Wir melden uns nur dann wieder bei Ihnen, wenn wir weitere Einzelheiten wissen müssen oder weitere Informationen für Sie haben.

Art des Missbrauchs:

Zum Beispiel antisemitische Inhalte, rassistische Inhalte oder Material, das zu einer Gewalttat führen könnte.

Beispielsweise eine Kreditkartennummer, persönliche Identifikationsnummer oder unveröffentlichte Privatadresse. Beachten Sie, dass E-Mail-Adressen und der vollständige Name nicht als private Informationen angesehen werden.

Forenregeln

Um zu sinnvolle Fragen zu kommen halten Sie sich bitte an folgende Spielregeln:

Neu registrieren

Registrieren auf E - Mails für Ulma 40 Kw wenn:


Sie erhalten eine E-Mail, um sich für eine oder beide Optionen anzumelden.


Andere Handbücher von Ulma 40 Kw

Ulma 40 Kw Bedienungsanleitung - Holländisch - 10 seiten

Ulma 40 Kw Bedienungsanleitung - Französisch - 10 seiten


Das Handbuch wird per E-Mail gesendet. Überprüfen Sie ihre E-Mail.

Wenn Sie innerhalb von 15 Minuten keine E-Mail mit dem Handbuch erhalten haben, kann es sein, dass Sie eine falsche E-Mail-Adresse eingegeben haben oder dass Ihr ISP eine maximale Größe eingestellt hat, um E-Mails zu erhalten, die kleiner als die Größe des Handbuchs sind.

Ihre Frage wurde zu diesem Forum hinzugefügt

Möchten Sie eine E-Mail erhalten, wenn neue Antworten und Fragen veröffentlicht werden? Geben Sie bitte Ihre Email-Adresse ein.



Info