Detail 1:
Fit the brush handle extension
onto the turbulator remover
Withdraw the pin from turbulator.
Detail 2:
Fit the pin in the radial hole with a hammer.
Detail 3:
Screw the turbulator remover onto the
turbulator.
Detail 4:
Turn up to unblock the turbulator.
Detail 5:
Withdraw the turbulator
Detail 6:
Turn the remover counterclockwise to
release the turbulator
The procedure from detail 3 to 6 has to be repeated for all the turbulators.
Turbulators removal
4.2 - PRELIMINARY CHECK
Once all the hydraulic, electrical and fuel
connections have been made, before starting
the boiler we suggest to ascertain that:
- The expansion vessel and the pressure
relief valve are correctly connected and
are in no way interceptable.
- The bulb of thermometer, working, high
limit and minimum thermostats are well
secured into their proper bulb holder.
- The turbulators are correctly fitted in all
the smoke pipes.
- The C.H. circuit has been washed and
rinsed and is free from solid impurities.
- The C.H. circuit is filled with water and
has been completely purged.
- The pumps operate properly.
- The flow switch, the pressure relief valve,
and the overheating discharge valve, if
any, are adjusted at the right value.
- The fuel, hydraulic, electrical and safety
connections are executed in conformity
with national and local requirements in
force.
- There are no water leaks.
- The burner has been fitted according to
the instructions of the burner
manufacturer.
- The mains voltage and frequency are
compatible with the burner and the
electrical equipment of the boiler.
- The burner is adjusted for the fuel type,
among those listed in the burner data plate,
available on the installation site, and the
burner output range is compatible with the
boiler output.
- In the boiler house there are also the burner
instructions.
- The C.H. pipes are properly insulated.
- The C.H. system is capable to absorb the
heat quantity produced at the first start of
the burner, during the test period.
- The shunt pump is installed as
prescribed in the paragraph 2.5.6.
4.3 - FIRST COMMISSIONING
At the commissioning stage of the boiler a
qualified technician has to perform the
following checks:
- Internal and external sound test of burner
and fuel feeding pipe;
- Adjustment of the fuel throughput according
to the nominal input of the boiler (it is
convenient to remember that the nominal
input can be adjusted between the minimum
and the maximum shown in the table of
pages 5 to 8), by sharing the output between
the 1st and the 2nd stage, knowing that
the 1st stage flame can go down to the
60% of the nominal output (which at its
turn can vary between the minimum and
the maximum depending on the output
requested by the C.H. system).
Proceed, then, in the following way:
- Open the fuel feeding cock and check that
there are no leaks in the feeding line.
- Ascertain that all the switches of the
panel board are in OFF position and adjust
the working thermostat to the
minimum position.
- Switch ON the panel board through the
main switch.
- Switch ON the C.H. pump: it will start to
rotate as soon as the minimum water
temperature thermostat detects 50°C.
- Switch the burner ON.
- Position the working thermostats of 1st
and 2nd stages to the maximum setting
to create a heat request.
During this phase check that:
- There are no smoke leaks from the front
door, the burner plate and the chimney
connection.
- There is a draught at the chimney base
between 2 and 4 mm w.g.
- There are no water leaks.
- The different thermostats and the other
installation safety devices work properly.
- The shunt pump operates correctly.
- The burner ignition is good.
- The burner characteristics (main
adjustments and nozzle type) correspond
to the boiler data plate.
With a burner properly adjusted it must be
possible to reach easily, from a smoke sample
taken at the chimney base, the values given
below:
1) With light oil having a maximum viscosity
of 1.5 °E at 20 °C:
- CO = 12 to 13 %
- Smoke index < 1
- Smoke temperature = 190 to 210 °C
2) With Natural Gas:
- CO = 9 to 10 %
- Smoke temperature = 180 to 200 °C
(values related to a clean boiler, with water
at 70 °C).
It is suggested to adjust the fuel throughput
to the actual needs of the C.H. installation
(avoid to overcharge the boiler), without
exceeding the a.m. smoke temperatures
(never go below 160 °C).
fig. 34
29

Brauchen Sie Hilfe? Stellen Sie Ihre Frage.

Forenregeln

Missbrauch melden von Frage und/oder Antwort

Libble nimmt den Missbrauch seiner Dienste sehr ernst. Wir setzen uns dafür ein, derartige Missbrauchsfälle gemäß den Gesetzen Ihres Heimatlandes zu behandeln. Wenn Sie eine Meldung übermitteln, überprüfen wir Ihre Informationen und ergreifen entsprechende Maßnahmen. Wir melden uns nur dann wieder bei Ihnen, wenn wir weitere Einzelheiten wissen müssen oder weitere Informationen für Sie haben.

Art des Missbrauchs:

Zum Beispiel antisemitische Inhalte, rassistische Inhalte oder Material, das zu einer Gewalttat führen könnte.

Beispielsweise eine Kreditkartennummer, persönliche Identifikationsnummer oder unveröffentlichte Privatadresse. Beachten Sie, dass E-Mail-Adressen und der vollständige Name nicht als private Informationen angesehen werden.

Forenregeln

Um zu sinnvolle Fragen zu kommen halten Sie sich bitte an folgende Spielregeln:

Neu registrieren

Registrieren auf E - Mails für Unical Ellprex wenn:


Sie erhalten eine E-Mail, um sich für eine oder beide Optionen anzumelden.


Das Handbuch wird per E-Mail gesendet. Überprüfen Sie ihre E-Mail.

Wenn Sie innerhalb von 15 Minuten keine E-Mail mit dem Handbuch erhalten haben, kann es sein, dass Sie eine falsche E-Mail-Adresse eingegeben haben oder dass Ihr ISP eine maximale Größe eingestellt hat, um E-Mails zu erhalten, die kleiner als die Größe des Handbuchs sind.

Ihre Frage wurde zu diesem Forum hinzugefügt

Möchten Sie eine E-Mail erhalten, wenn neue Antworten und Fragen veröffentlicht werden? Geben Sie bitte Ihre Email-Adresse ein.



Info