Use L and R labeled
ports only.
Do NOT use X port.
Figure A
NO PORT
HERE
CONNECTION
PORTS
Figure C
Cables extending through
hole ABOVE cable channel.
BLACK
STRIPE
ON CABLE
PART 1 - Assembly
PERFORMANCE MONITOR INSTALLATION OVERVIEW
The following steps will walk you through the proper installation of the Performance Monitor. The “Monitor
Location” section will review the various monitor locations. Select the location that will provide the best
visibility for your training needs.
6WHSVFRYHU %DWWHU\,QVWDOODWLRQ
$WWDFKLQJWKH&DEOHV
0RQLWRU/RFDWLRQ2SWLRQV
0RQLWRU,QVWDOODWLRQDQG$GMXVWPHQW
Performance monitor operation will be covered in Part 2 of this manual.
CAUTION: The monitor is a sensitive unit. Please handle with care at all times.
STEP 8: INSTALLING BATTERIES IN THE PERFORMANCE MONITOR
8.1. Locate the performance monitor in the small box packed inside BOX 3.
8.2. Insert the two “AA” batteries (included) into the battery compartment on the back side of the monitor.
IMPORTANT: REMOVE THE BATTERIES if the Vasa Ergometer will be idol for 3 months or more.
STEP 9: ATTACHING THE CABLES TO THE PERFORMANCE MONITOR
NOTE: Step 9 is informational only at this time. Do NOT connect the monitor to connection cables until
directed to in Step 10.
9.1. The back of the monitor has three connection ports: X, R, and L (Figure A). You will only be using the
ports labeled “R” and “L”.
Do NOT use the port labeled “X” .
9.2. Locate the two cables extending from rear cover. The cables will be exiting from either:
1) the cable channel above the damper door (Figure B); or
2) through a 5/8” hole below the monorail bracket of the front frame (Figure C)
9.3. One of the cables will have a BLACK STRIPE at the end of the cable next to the connection end.
Connect the BLACK cable into the L port on the back of the monitor (Figure D). Connect the remaining
unmarked cable into the R port.
IMPORTANT: Always power the monitor OFF after you connect the cables to reset.