809256
5
Zoom out
Zoom in
Vorherige Seite
1/64
Nächste Seite
Installation regulations
Greenstar Danesmoor Utility 2022+ and Utility System 2022+ - 6 721 846 263 (2022/01) 5
2 Installation regulations
2.1 Complying with the building regulations
This heating appliance forms part of the controlled services for the
building. It is law that all controlled services for buildings must comply
with building regulations. You must be able to satisfy your Local
Authority Building Control Body (LABC) that the work carried out
concerning the installation and commissioning of this heating appliance
has been carried out to a satisfactory standard.
OFTEC operate a competent persons scheme and registered installers
are able to certify that their work complies with building regulations.
Under the scheme;
OFTEC must be informed about every installation.
OFTEC will issue a building regulations compliance certificate to the
householder and will notify the LABC.
OFTEC provide controlled document forms CD10 and CD11 for use
during installation and commissioning respectively.
Other organisations operate self-certification schemes e.g. NAPIT and
BESCA Ltd. and it may be possible for installers who are members of
these organisations to self certify their work.
Alternatively you must submit a building control notice to the LABC
before installing any boiler. The LABC will then arrange regular
inspection visits during the work to ensure that the installation complies
with the regulations.
Installation
Failure to install appliances correctly could lead to prosecution.
The appliance should be installed by a competent person. The person
installing the appliance should be aware of the Health and Safety at Work
Act and take appropriate action to ensure that the regulations are
adhered to. In order to give optimum efficiency and trouble free
operation the appliance must be commissioned by a qualified OFTEC
engineer.
The compliance with a British Standard does not, in itself, confer
immunity from legal obligations. In particular the installation of this
appliance must be in accordance with the relevant requirements of the
following British Standards and regulations in respect of the safe
installation of equipment:
BS 5410: part 1: Code of practice for Liquid Fuelled Boilers.
BS 799: part 5: Specification for Oil Storage Tanks.
BS 7593: Code of Practice for treatment of water in domestic
hot water central heating systems.
BS 5449: part 1: Specification for forced circulation hot water central
heating for domestic premises.
BS 5955: part 8: Specification for the installation of thermoplastic
pipes and associated fittings for use in domestic hot
and cold water services and heating systems.
BS 7291: Thermoplastic pipes and associated fittings for hot
and cold water for domestic purposes and heating
installations in buildings.
BS 7074: part 1: Application, selection and installation of expansion
vessels and ancillary equipment for sealed water
systems.
BS 1254-2: Copper and copper alloys plumbing fittings part 2:
Fittings with compression ends for use with copper
tubes.
BS 7671: IET Wiring Regulations, current edition.
BS 1362: Specification for general purpose fuse links for
domestic and similar purposes.
BS EN 12828 Heating systems in buildings. Design for water-
based heating systems.
The Building Regulations Part G, Part J and L1 England and Wales; Part
F, Part G and Part J Section III Scotland; Part L and Part F Northern
Ireland.
Local water company bye-laws.
The Control of Pollution (Oil) Regulations.
OFTEC Standards.
Where no specific instruction is given, reference should be made to the
relevant codes of practice.
Installations in Eire (Republic of Ireland)
The Installation must be performed by a competent and suitably trained
person in accordance with the following Eire regulations.
Current Building Regulations - Republic of Ireland
ETCI rules for electrical installation
For further guidance see:
OFTEC Technical book three - Regional requirements: Republic of
Ireland
5

Brauchen Sie Hilfe? Stellen Sie Ihre Frage.

Forenregeln

Missbrauch melden von Frage und/oder Antwort

Libble nimmt den Missbrauch seiner Dienste sehr ernst. Wir setzen uns dafür ein, derartige Missbrauchsfälle gemäß den Gesetzen Ihres Heimatlandes zu behandeln. Wenn Sie eine Meldung übermitteln, überprüfen wir Ihre Informationen und ergreifen entsprechende Maßnahmen. Wir melden uns nur dann wieder bei Ihnen, wenn wir weitere Einzelheiten wissen müssen oder weitere Informationen für Sie haben.

Art des Missbrauchs:

Zum Beispiel antisemitische Inhalte, rassistische Inhalte oder Material, das zu einer Gewalttat führen könnte.

Beispielsweise eine Kreditkartennummer, persönliche Identifikationsnummer oder unveröffentlichte Privatadresse. Beachten Sie, dass E-Mail-Adressen und der vollständige Name nicht als private Informationen angesehen werden.

Forenregeln

Um zu sinnvolle Fragen zu kommen halten Sie sich bitte an folgende Spielregeln:

Neu registrieren

Registrieren auf E - Mails für Worcester-Bosch Greenstar Danesmoor Utility Regular - Utility System wenn:


Sie erhalten eine E-Mail, um sich für eine oder beide Optionen anzumelden.


Das Handbuch wird per E-Mail gesendet. Überprüfen Sie ihre E-Mail.

Wenn Sie innerhalb von 15 Minuten keine E-Mail mit dem Handbuch erhalten haben, kann es sein, dass Sie eine falsche E-Mail-Adresse eingegeben haben oder dass Ihr ISP eine maximale Größe eingestellt hat, um E-Mails zu erhalten, die kleiner als die Größe des Handbuchs sind.

Ihre Frage wurde zu diesem Forum hinzugefügt

Möchten Sie eine E-Mail erhalten, wenn neue Antworten und Fragen veröffentlicht werden? Geben Sie bitte Ihre Email-Adresse ein.



Info