809256
11
Zoom out
Zoom in
Vorherige Seite
1/64
Nächste Seite
Pre-Installation
Greenstar Danesmoor Utility 2022+ and Utility System 2022+ - 6 721 846 263 (2022/01) 11
4 Pre-Installation
4.1 Cleaning primary systems
4.1.1 Before cleaning the system:
Ensure that the system and pipe work is in good working order.
Where possible keep the existing appliance/circulating pump in
place when flushing the system.
Follow the guidance of BS7593:
Treatment of water in domestic hot water central heating and also the
flushing guidelines below.
4.1.2 Flushing the system
Fill the system with cold water and check for leaks.
Open vented systems only:
Turn off the water to the system header tank.
Open all drain cocks and drain the system.
Close drain cocks and add a suitable flushing agent at the correct
strength for the system conditions in accordance with the
manufacturer‘s instructions.
Circulate the flushing agent before the boiler is fired up.
Run the boiler/system at normal operating temperature as directed
by the manufacturer of the flushing agent.
Drain and thoroughly flush the system to remove the flushing agent
and debris.
It may be necessary to use a power flushing machine to aid the
cleansing procedure in some circumstances.
Close the drain cocks and manual air vents.
Add a suitable inhibitor to the system in accordance with the
manufacturers instructions.
Open vented systems only:
Turn on the water to the system header tank and allow the system
to fill.
Sealed systems only:
Fill the system to between 1 and 1.5 bar via a WRAS approved
filling loop.
Vent any air from the boiler and system.
4.1.3 Inhibitor
Add a suitable inhibitor or combined inhibitor/anti-freeze, if the system
is exposed to freezing conditions, to the heating system in accordance
with the DWTA code of practice and manufacturer‘s guidelines.
Water treatment products
Suitable water treatment products can be obtain from the following
manufacturers:
4.1.4 Artificially softened water
It is possible to have an ion exchange water softener fitted to the cold
water system of the property. However, the boiler requires an untreated
cold water connection taken from the mains supply, before the water
softener, to the primary water filling point of the heating system.
Alternatively there are water softening/treatment devices that do not
adjust or alter the pH levels of the water. With these devices it may not
be necessary to provide an untreated water by-pass to the primary water
filling point of the heat system.
4.2 Mains supply
4.2.1 Electrical supply
Supply: 230V - 50 Hz
Cable: PVC insulated 0.75 mm2 (24 x 0.2mm) temperature rated to
90°C.
External 5A fuse to BS1362.
The appliance must be earthed.
This appliance must not be connected to a three phase supply.
Wiring must comply with the latest IET wiring regulations.
It must be possible to isolate the appliance from the electrical supply
with at least a 3mm contact separation in both poles supplying the
appliance.
Wiring between the appliance and the electrical supply must comply
with IET wiring regulations and any local regulations that may apply
for fixed wiring to a stationary appliance.
Any additional components that are connected to the boiler with
mains electrical supply must not have a separate supply.
DANGER: Danger to life through electric shock!
Before carrying out any work on electrical
components, isolate them from the power supply
(230 V AC) (fuse, circuit breaker) and secure against
unintentional reconnection.
NOTICE: Risk of damage to appliance or accessories!
All the following pre-installation sections must be
read and requirements met before starting the
appliance or flue installations.
NOTICE: Risk of damage to system or appliance!
Debris from the system can damage the appliance and
reduce efficiency. Failure to comply with the guidelines
for the use of water treatment with the appliance will
invalidate the appliance guarantee and contravene the
Building Regulations.
It is a requirement of the Building Services
Compliance Guide which is a second tier document
to the Building Regulations to flush and inhibit the
primary water system in accordance with BS 7593.
▶It is recommended that you fit a primary water
cleanser to the system. Worcester recommends
fitting a filter that will help remove both magnetite
and non-magnetic debris.
The inhibitor or combined inhibitor/anti-freeze must not
cause damage to the materials within the boiler (mild
steel, stainless steel, copper and brass) and any other
materials/components within the system.
The concentration level of inhibitor in the system
should be checked every 12 months or sooner if
system content is lost.
WARNING: Sealing agents
In cases where all attempts to find a system micro
leak have failed, Worcester, Bosch Group supports
the use of Fernox F4 leak sealer.
ADEY 01242 546700
www.adey.com
FERNOX 0330 100 7750
www.fernox.com
SENTINEL 01928 704330
www.sentinelprotects.com/uk
NOTICE:
Salt based, softened water must not be used to fill
the central heating system.
11

Brauchen Sie Hilfe? Stellen Sie Ihre Frage.

Forenregeln

Missbrauch melden von Frage und/oder Antwort

Libble nimmt den Missbrauch seiner Dienste sehr ernst. Wir setzen uns dafür ein, derartige Missbrauchsfälle gemäß den Gesetzen Ihres Heimatlandes zu behandeln. Wenn Sie eine Meldung übermitteln, überprüfen wir Ihre Informationen und ergreifen entsprechende Maßnahmen. Wir melden uns nur dann wieder bei Ihnen, wenn wir weitere Einzelheiten wissen müssen oder weitere Informationen für Sie haben.

Art des Missbrauchs:

Zum Beispiel antisemitische Inhalte, rassistische Inhalte oder Material, das zu einer Gewalttat führen könnte.

Beispielsweise eine Kreditkartennummer, persönliche Identifikationsnummer oder unveröffentlichte Privatadresse. Beachten Sie, dass E-Mail-Adressen und der vollständige Name nicht als private Informationen angesehen werden.

Forenregeln

Um zu sinnvolle Fragen zu kommen halten Sie sich bitte an folgende Spielregeln:

Neu registrieren

Registrieren auf E - Mails für Worcester-Bosch Greenstar Danesmoor Utility Regular - Utility System wenn:


Sie erhalten eine E-Mail, um sich für eine oder beide Optionen anzumelden.


Das Handbuch wird per E-Mail gesendet. Überprüfen Sie ihre E-Mail.

Wenn Sie innerhalb von 15 Minuten keine E-Mail mit dem Handbuch erhalten haben, kann es sein, dass Sie eine falsche E-Mail-Adresse eingegeben haben oder dass Ihr ISP eine maximale Größe eingestellt hat, um E-Mails zu erhalten, die kleiner als die Größe des Handbuchs sind.

Ihre Frage wurde zu diesem Forum hinzugefügt

Möchten Sie eine E-Mail erhalten, wenn neue Antworten und Fragen veröffentlicht werden? Geben Sie bitte Ihre Email-Adresse ein.



Info