Pre-Installation
Greenstar Danesmoor Utility 2022+ and Utility System 2022+ - 6 721 846 263 (2022/01) 17
CONDENSATE SOAK AWAY
The condensate soak away must be sited at least 500mm away from
building footings.
The condensate drainage pipe may be run above or below the ground
to the soak away. The examples shown on this page run above
ground.
The soak away must use a 100mm Ø plastic tube with two rows of
three 12mm holes on 25mm centres and 50mm from the bottom of
the tube. The holes must face away from the house.
The tube must be surrounded by at least 100mm of limestone
chippings to a depth of 400mm.
In situations where there are likely to be extremes of temperature or
exposure, the use of a proprietary trace-heating system for external pipe
work, incorporating an external frost thermostat, should be considered.
If such a system is used, the requirement to use 32mm pipe does not
apply. However, all other guidance above and the instructions for the
trace heating system, should be closely followed.
Fig. 19 To a soakaway
4.6 Pressure relief pipework
The pressure relief discharge pipe (1) should be at least 15 mm
diameter copper pipe and run downwards away from the boiler and
discharge away from any electrical or other hazard, preferably to an
external drain or soakaway.
Pipe (3) should be finished with a partial bend, near the outlet to face
the external wall (as shown) to help prevent freezing.
Fig. 20 Pressure relief pipe work
[2] Outside wall
[1, 3] PRV discharge pipe
[4] External drain
4.7 Boiler locations and clearances
This boiler is only suitable for installing internally within a property at a
suitable location onto a fixed rigid surface of the same size as the boiler
and capable of supporting the boiler weight.
The boiler must be installed on a flat level surface to ensure condensate
does not enter the primary heat exchanger.
The boiler is not suitable for external installation unless a suitable
enclosure is provided.
Roof space installations must fully conform to BS 5410 part 1 section
5.6.9.
Open flue model (CF)
In order to ensure clean and efficient combustion an adequate supply of
air must be delivered to the combustion chamber.
To provide sufficient air a suitable inlet must be provided into the room
or space in which the boiler is situated.
An air brick or other form of continuous air supply may have to be built
into the installation in order to ensure an adequate supply of air.
If the appliance is to be installed in a confined space or compartment two
air vents are required, one at high level and one at low level.
Minimum hole size for the condensate soak away must be
400mm deep by 300mmØ .
NOTICE: Unheated internal areas.
Internal pipe runs in unheated areas such as lofts,
basements and garages should be treated as external
runs and consideration should be given to using a
CondenseSure siphon.
6720821683-30.1Wo
500mm min.
25mm min.
400mm min.
9
16
18
17
19
15
15
16
1
8
11
Unsuitable for clay soil types
WARNING: Carbon Monoxide
A carbon monoxide detector conforming to BS EN
50291-1 should be installed in accordance with the
manufacturer’s instructions.
Output 12/18 18/25 25/32
Size cm299 138 165
1
2
3
4
2
3
4
1
2
6720646608-123.1Wo
17

Brauchen Sie Hilfe? Stellen Sie Ihre Frage.

Forenregeln

Missbrauch melden von Frage und/oder Antwort

Libble nimmt den Missbrauch seiner Dienste sehr ernst. Wir setzen uns dafür ein, derartige Missbrauchsfälle gemäß den Gesetzen Ihres Heimatlandes zu behandeln. Wenn Sie eine Meldung übermitteln, überprüfen wir Ihre Informationen und ergreifen entsprechende Maßnahmen. Wir melden uns nur dann wieder bei Ihnen, wenn wir weitere Einzelheiten wissen müssen oder weitere Informationen für Sie haben.

Art des Missbrauchs:

Zum Beispiel antisemitische Inhalte, rassistische Inhalte oder Material, das zu einer Gewalttat führen könnte.

Beispielsweise eine Kreditkartennummer, persönliche Identifikationsnummer oder unveröffentlichte Privatadresse. Beachten Sie, dass E-Mail-Adressen und der vollständige Name nicht als private Informationen angesehen werden.

Forenregeln

Um zu sinnvolle Fragen zu kommen halten Sie sich bitte an folgende Spielregeln:

Neu registrieren

Registrieren auf E - Mails für Worcester-Bosch Greenstar Danesmoor Utility Regular - Utility System wenn:


Sie erhalten eine E-Mail, um sich für eine oder beide Optionen anzumelden.


Das Handbuch wird per E-Mail gesendet. Überprüfen Sie ihre E-Mail.

Wenn Sie innerhalb von 15 Minuten keine E-Mail mit dem Handbuch erhalten haben, kann es sein, dass Sie eine falsche E-Mail-Adresse eingegeben haben oder dass Ihr ISP eine maximale Größe eingestellt hat, um E-Mails zu erhalten, die kleiner als die Größe des Handbuchs sind.

Ihre Frage wurde zu diesem Forum hinzugefügt

Möchten Sie eine E-Mail erhalten, wenn neue Antworten und Fragen veröffentlicht werden? Geben Sie bitte Ihre Email-Adresse ein.



Info