GB15
- Installation or maintenance must be carried out by a qualified technician.
- Very heavy product; hood handling and installation must be carried out by at least two persons.
The instructions below, to be carried out in the order in which they are numbered, refer to the figures (with the same step numbers) given on the last pages of
this manual.
1. Remove the hood body from the packaging and carry out the following preliminary procedures:
1. Detach the perimeter panel from the structure
2. Remove the grease filter
3. Loosen the 8 screws, M6X15, fixing the hood body to the motorbox
4. Disconnect the motor wiring
5. Loosen the 6 screws, M6X15, fixing the ceiling brackets to the motorbox
6. Separate the telescopic ceiling brackets by removing the 16 screws Ø4x8
2. Position the supplied installation template on the ceiling, drill holes in the ceiling as indicated and mark the position of the ceiling installation holes on the
basis of the four points provided on the template.
The extractor hood must be installed in a central position in relation to the hob.
IMPORTANT: Make sure an electrical socket is available and accessible for hood connection.
3. There must be a distance of at least 305 mm between the false ceiling and the ceiling
There must be a distance of no more than 369 mm between the false ceiling and the ceiling
4. Make the four Ø10 holes using a suitable drill and fully insert the corresponding plugs (see fig.) supplied with the product; fit the two brackets (previously
removed from the hood body) to the ceiling and secure them using the 4 screws (see fig.)
5. Fit the two lower brackets (previously removed from the hood body), sliding them into the two upper brackets (A)
Secure each of the two lower brackets to the upper brackets using 8 screws (see fig.) (B)
The extension length of the two brackets should observe the following formula:
E=(H-305)+236
6. Fit the hood body to the two brackets (A) and secure using 6 screws (see fig.) (B)
IMPORTANT: this procedure must be carried out by at least three persons
N.B.: Fix the air outlet flange to the motorbox using the 2 screws Ø3X9
7. This is the front view of your hood when correctly installed
8. Make sure the hose is available and connect it to the hood.
IMPORTANT:The exhaust air channel must be prepared so that you can connect the extractor hood easily. The exhaust air hose must not be bent.
9. Carry out electrical connection (A) and install the (previously dismantled) lower hood structure (B), and fix it to the hood body using 8 screws (see fig.) (C)
10. Fit the (previously dismantled) perimeter panel onto the hood body and secure it using 4 screws (see fig.).
ATTENTION:
INSTALLATION - ASSEMBLY INSTRUCTIONS