499507
28
Zoom out
Zoom in
Vorherige Seite
1/44
Nächste Seite
- 28 -
0DT829 15/10/2012
3. MECHANICAL INSTALLATION
See the relevant drawings of the mechanical installation at page. 22 – 23 (central sheet to be removed).

Check the size of the opening and that it corresponds to the measurements of the door supplied bearing in mind any
tolerances needed if installed within the doorway. Check that obstacles do not prevent installation.
Make sure that the mounting surfaces are level and adjust them using suitably sized spacers if necessary.
Check the consistency of the opening structure: it must be securely anchored with brackets or plugs. If consistency is poor
or uncertain, a suitable self-supporting metal structure must be provided.

Measure the overall dimensions of the crosspiece (LT) and mark the position of the uprights.
Remove the covers of the uprights and x the bases according to the marks using M8 size plugs 
Plumb the uprights and x them at the indicated points (A) when using external brackets or (B) when xing from inside
the column. M8 size plugs. Check the diagonals.
Do not drill holes in the upright near the counterweight sliding area (C).
3.3 Assembling the crosspiece
Remove the M8 bolts preassembled on the ends of the crosspiece.
Lift the crosspiece using appropriate lifting equipment.
Place the crosspiece on the uprights, reinsert the xing bolts and tighten them 
For doors with PL > 4000 we recommend fastening the crosspiece in the centre (to avoid unsightly bending of the
frame).
3.4 Placing the crosspiece in position
By referring to , place the belt transmission wheel according to the position of the curtain. The standard
installation is as shown in 
If the belt transmission wheel does not remain in position “5A”, remove the wheel by loosening the M8 xing bolt and put
the belt transmission wheel back into the required position. After xing the wheel, check that it turns smoothly. Repeat the
same procedure for each support.
3.5 Assembling the curtain
Insert the curtain in the uprights and lift it. Make sure that the belt rings are positioned correctly.
Using the M8 bolts supplied, fasten the curtain attachment sleeve to the crosspiece 
Lower the curtain until it is completely unrolled. For Ditec Trafc C with a modular curtain: adjust the length of the curtain
by rolling it onto the hook-up tubing if necessary.
Unwind the curtain lifting belts and leave at least two belt turns on the winding drum. 
Insert the belts in the belt rings placed along the curtain. 
Fix the end parts of the belts using the brackets on the 1st tube. 
Fix the tubes using the plastic shells to prevent them sliding sideways  The shells are already xed on the 1st tube.
3.6 Assembling the counterweights
Lift the counterweight using appropriate lifting equipment (forklift truck).
Unroll the belts and pass them around the transmission pulleys. Wind the belt around the upper pin and x it using the
special plate. Place the counterweight approximately 200 mm away from the stroke top end. ()
Finely adjust the balance using the 4 lower counterweight elements. ()
3.7 Assembling the emergency release lever (optional)
The emergency release lever must be assembled at least 1.8 m off the ground 
Place the drive cable in the spaces and connect it to the gearmotor brake 
Check that the device is operating correctly; when the lever is operated, the curtain should be free to rise.
For Ditec Trafc CM with twin motors, the release devices are connected by way of the device shown in 
3.8 Installing the photocells
Install the containers on the column  For connections, follow the instructions in the photocell package.
3.9 Installing the safety edge
Place the curtain at a height of approximately 1 m.
Insert the safety edge into the lower pocket of the curtain 
Run the edge along the entire length of the curtain and place it in the exact centre of the curtain.
28

Brauchen Sie Hilfe? Stellen Sie Ihre Frage.

Forenregeln

Missbrauch melden von Frage und/oder Antwort

Libble nimmt den Missbrauch seiner Dienste sehr ernst. Wir setzen uns dafür ein, derartige Missbrauchsfälle gemäß den Gesetzen Ihres Heimatlandes zu behandeln. Wenn Sie eine Meldung übermitteln, überprüfen wir Ihre Informationen und ergreifen entsprechende Maßnahmen. Wir melden uns nur dann wieder bei Ihnen, wenn wir weitere Einzelheiten wissen müssen oder weitere Informationen für Sie haben.

Art des Missbrauchs:

Zum Beispiel antisemitische Inhalte, rassistische Inhalte oder Material, das zu einer Gewalttat führen könnte.

Beispielsweise eine Kreditkartennummer, persönliche Identifikationsnummer oder unveröffentlichte Privatadresse. Beachten Sie, dass E-Mail-Adressen und der vollständige Name nicht als private Informationen angesehen werden.

Forenregeln

Um zu sinnvolle Fragen zu kommen halten Sie sich bitte an folgende Spielregeln:

Neu registrieren

Registrieren auf E - Mails für DITEC Traffic CM wenn:


Sie erhalten eine E-Mail, um sich für eine oder beide Optionen anzumelden.


Das Handbuch wird per E-Mail gesendet. Überprüfen Sie ihre E-Mail.

Wenn Sie innerhalb von 15 Minuten keine E-Mail mit dem Handbuch erhalten haben, kann es sein, dass Sie eine falsche E-Mail-Adresse eingegeben haben oder dass Ihr ISP eine maximale Größe eingestellt hat, um E-Mails zu erhalten, die kleiner als die Größe des Handbuchs sind.

Ihre Frage wurde zu diesem Forum hinzugefügt

Möchten Sie eine E-Mail erhalten, wenn neue Antworten und Fragen veröffentlicht werden? Geben Sie bitte Ihre Email-Adresse ein.



Info