683788
10
Zoom out
Zoom in
Vorherige Seite
1/42
Nächste Seite
10
First Operation
2 First Operation
2.1 Instruction
Instruction is required before first ope-
ration. First instruction into handling of
the machine must be held by a qualified
person sent by your local Hako contract
dealer. Your Hako dealer will be infor-
med by the manufacturer upon delivery
of the vehicle and will contact you to
make a date for instruction.
2.2 Initial charging procedure
Before first operation of the
machine, fully charge the bat-
tery with an initial charging pro-
cedure and comply with the
operating instructions of the
charger as well as with those of
the battery manufacturer.
Hako cannot be held liable for
damages resulting from the
fact that the initial charging has
not or insufficiently been done.
2.3 Before Taking into Operation
Proceed to the following inspections be-
fore taking the machine into operation:
1. Check parking site for signs of leaka-
ge. Hoses, lines and tanks must be
free from any leakage or damage.
2. Install brushes and squeegee, see
maintenance chapter.
3. Install batteries and connect battery
plug, see maintenance chapter.
4. Check battery charge and proceed
to re-charging of batteries if required.
Generally proceed to initial charging
before first operation of the machine.
5. Empty soiled water tank and clean it
if required, see maintenance chap-
ter.
6. Re-fill clear water tank and add cle-
aning agent according to the manu-
facturer's recommendations.
Use only cleaning agents sui-
table for automatic machines
(low-foaming) and comply with
the instructions for use, dispo-
sal and with the warning infor-
mation specified by the cle-
aning agent's manufacturer.
2.4 Start Machine
Before start of the machine, set
accelerator level to neutral po-
sition. Should the accelerator
lever be out of neutral position
and machine be switched on,
an error message occurs.
Proceed to the following to set the ma-
chine into operating mode:
Disconnect mains plug of the char-
ger from outlet and fasten to holder if
require.
Switch on machine by actuation of
key switch from position (0) to positi-
on (1).
10
First Operation
2 First Operation
2.1 Instruction
Instruction is required before first ope-
ration. First instruction into handling of
the machine must be held by a qualified
person sent by your local Hako contract
dealer. Your Hako dealer will be infor-
med by the manufacturer upon delivery
of the vehicle and will contact you to
make a date for instruction.
2.2 Initial charging procedure
Before first operation of the
machine, fully charge the bat-
tery with an initial charging pro-
cedure and comply with the
operating instructions of the
charger as well as with those of
the battery manufacturer.
Hako cannot be held liable for
damages resulting from the
fact that the initial charging has
not or insufficiently been done.
2.3 Before Taking into Operation
Proceed to the following inspections be-
fore taking the machine into operation:
1. Check parking site for signs of leaka-
ge. Hoses, lines and tanks must be
free from any leakage or damage.
2. Install brushes and squeegee, see
maintenance chapter.
3. Install batteries and connect battery
plug, see maintenance chapter.
4. Check battery charge and proceed
to re-charging of batteries if required.
Generally proceed to initial charging
before first operation of the machine.
5. Empty soiled water tank and clean it
if required, see maintenance chap-
ter.
6. Re-fill clear water tank and add cle-
aning agent according to the manu-
facturer's recommendations.
Use only cleaning agents sui-
table for automatic machines
(low-foaming) and comply with
the instructions for use, dispo-
sal and with the warning infor-
mation specified by the cle-
aning agent's manufacturer.
2.4 Start Machine
Before start of the machine, set
accelerator level to neutral po-
sition. Should the accelerator
lever be out of neutral position
and machine be switched on,
an error message occurs.
Proceed to the following to set the ma-
chine into operating mode:
Disconnect mains plug of the char-
ger from outlet and fasten to holder if
require.
Switch on machine by actuation of
key switch from position (0) to positi-
on (1).
10

Brauchen Sie Hilfe? Stellen Sie Ihre Frage.

Forenregeln
1

Forum

hako-scrubmaster-b-70-cl

Suche zurücksetzen

  • Batterien sind voll aber beim einschalten Anzeige H und Batterien leer? Eingereicht am 30-5-2023 09:33

    Antworten Frage melden

Missbrauch melden von Frage und/oder Antwort

Libble nimmt den Missbrauch seiner Dienste sehr ernst. Wir setzen uns dafür ein, derartige Missbrauchsfälle gemäß den Gesetzen Ihres Heimatlandes zu behandeln. Wenn Sie eine Meldung übermitteln, überprüfen wir Ihre Informationen und ergreifen entsprechende Maßnahmen. Wir melden uns nur dann wieder bei Ihnen, wenn wir weitere Einzelheiten wissen müssen oder weitere Informationen für Sie haben.

Art des Missbrauchs:

Zum Beispiel antisemitische Inhalte, rassistische Inhalte oder Material, das zu einer Gewalttat führen könnte.

Beispielsweise eine Kreditkartennummer, persönliche Identifikationsnummer oder unveröffentlichte Privatadresse. Beachten Sie, dass E-Mail-Adressen und der vollständige Name nicht als private Informationen angesehen werden.

Forenregeln

Um zu sinnvolle Fragen zu kommen halten Sie sich bitte an folgende Spielregeln:

Neu registrieren

Registrieren auf E - Mails für Hako Scrubmaster B 70 CL wenn:


Sie erhalten eine E-Mail, um sich für eine oder beide Optionen anzumelden.


Andere Handbücher von Hako Scrubmaster B 70 CL

Hako Scrubmaster B 70 CL Bedienungsanleitung - Deutsch - 42 seiten


Das Handbuch wird per E-Mail gesendet. Überprüfen Sie ihre E-Mail.

Wenn Sie innerhalb von 15 Minuten keine E-Mail mit dem Handbuch erhalten haben, kann es sein, dass Sie eine falsche E-Mail-Adresse eingegeben haben oder dass Ihr ISP eine maximale Größe eingestellt hat, um E-Mails zu erhalten, die kleiner als die Größe des Handbuchs sind.

Ihre Frage wurde zu diesem Forum hinzugefügt

Möchten Sie eine E-Mail erhalten, wenn neue Antworten und Fragen veröffentlicht werden? Geben Sie bitte Ihre Email-Adresse ein.



Info