PELLET STOVES Chapter 3
INSTALLATION AND USE MANUAL
page 18
Installation and fitting Technical service - Rights reserved MCZ S.p.A. - Reproduction prohibited
3.2. PREPARATION AND UNPACK ING
SOLAR and GEA stoves are delivered in two packages:
9 The first contains the stove (Fig. 1)
9 The second contains the ceramic cladding. (Fig. 2)
Open the packaging, take off the bands, remove the stove unit from
the pallet and position it in the chosen location, taking care that its
position complies with the above instructions.
The stove body or unit must always be kept in a vertical position when
moved, and moved only using carts. Special care must be used to
protect the door and the glass from impacts that would damage them.
Moving the product must always be done with care. If possible, unpack
the stove in the area where it is going to be installed.
The materials which make up the packaging are not toxic or harmful,
so no special procedures for disposal by required.
Their storage, disposal or possible recycling are therefore the responsibility
of the final user, in compliance with current legislation on the subject.
Do not store the stove unit or its cladding without their packaging.
If the stove needs to be connected to a discharge pipe which goes
through the rear wall (to connect up with the flue), take the greatest
care to make sure that the joint is not stressed.
Use the four adjustable feet (J) to get the stove correctly levelled so
that the smoke outlet (S) is lined up with the connecting pipe (H) .
If the smoke outlet of the stove is forced or used
improperly to lift it or position it, the operation of the
stove can be damaged irreparably (fig. 4).
S
H
Figure 1 – Example of stove packaging
Figure 2 - Example of packing for
ceramics
1. Turn the feet clockwise to
lower the stove
2. Turn the feet counter-
clockwise to lower the
stove
J
J