14
3. Insert 2 securing elements and screw tight.
4. Push ue duct upwards until it clicks into
position.
5. Insert metal-mesh grease lter.
Installation
Locking screws and locking caps
1. Mark the holes for the safety screws.
Detach the extractor hood, drill holes for
the safety screws and press in wall plugs
ush with the wall.
2. Attach the extractor hood and screw in
the safety screws tightly.
3. Press the safety caps with the arrow
upwards onto the brackets until they click
into position
Ⓒ.
ṇ RISK OF INJURY
Check that all locking screws and locking
caps have been attached securely!
4. Connect the pipes
(see ”Connecting pipes”).
5. Connect to the power supply
(see ”Electrical connection”).
Removing the safety caps
Remove the locking caps from the brackets
using a suitable tool, e.g. a at-blade
screwdriver.
Circulating air module
1. Place the circulating air module on the air
connection and screw tight.
2. Insert the activated-carbon lters.
Installing the ue ducts
ṇ RISK OF INJURY
The insides of the ue ducts may have sharp
edges. We recommend wearing protective
gloves during installation.
1. Remove the protective lm from both
ue ducts.
2. Insert ue into the guide rails and slide
down.