Installation
7. Remove the extractor hood. Drill the
4 lower 8 mm ø fixing holes and press
in the wall plugs flush with the wall.
08. Attach the extractor hood and screw
into position with the remaining
4 screws.
09. Stick protective film over the holes of
the 2 lower mounting bolts in the
protective grid.
10. Connect up the air outlet pipe.
11. Connect extractor hood to the power
supply.
min. 550
recommendation 650
3. Connect the screen (see operating and
installation instructions for the screen)
and secure with the enclosed installation
materials.
4. Insert the screen into the holder and
push all the way back (screen is not
illustrated).
5. Screw in the screen at the left and right
sides.
31
Installing the screen:
ṇ Do not place an indoor aerial inside the
flue duct.
1. Connect the power supply unit to the
power cord.
2. Insert the power supply unit into the
holder.