680772
13
Zoom out
Zoom in
Vorherige Seite
1/36
Nächste Seite
Attention!
Always install operator parallel to the guide rails of the door.
Align ceiling bracket (1). It should be located within a range of
(R = 0 ... 600 mm).
Align operator mechanism horizontally to rear centre of door (HM).
Mark position of holes. Drill two holes (Ø 10 x 65 mm).
Wear safety goggles when drilling!
Check thickness of ceiling, particularly in the case of prefabri-
cated garages!
Insert plug (1). Fit two screws (2) with plain washers (3).
Tighten the screws (2).
Align C-rail (4) at correct height. If necessary, change the positions of
the screws (5). Tighten the screws (5).
Mount connecting rod (1):
Insert the long bolt (2) and slide on the securing clip (3).
Attach the door hinge (4) to the connecting rod (1) using the short
bolt (5) and slide on the securing clip (3).
Pull the emergency release rope (N) once. The trolley (1) is released.
Tighten screw (8) at the lintel fixture.
Push the trolley (1) with the connecting rod (2) to the front stop (3).
If necessary, release switch-trigger (4).
Align the door hinge (5) to the centre of the door and mark the 5 drill
holes. Drill 5 holes (Ø 5 mm).
Insert screws that are suitable for securing the hinge to the door.
Wear safety goggles when drilling!
Insert 5 hexagon-head screws (6) and tighten securely.
Release switch-trigger (4) and push right up to trolley (7).
Tighten switch-trigger buffer screw (4) securely.
Release rear switch-trigger buffer (1) and push right back to stop (2).
Open door (3) by hand.
21
21
4
N
1
2
6
max. 30°
4
5
3
20
19
19
2
3
5
4
3
N
1
2
4 8
7
3
6
5
1
N
20
18
17
HM
Trim (e.g. saw off and debur) projecting part of ceiling bracket (4).
Slide the switch trigger (1) to the stop (6) at the trolley (5) until it
engages. Securely tighten screw on switch-trigger (1).
Caution!
After installation, check the drive rail for dirt (e.g. drilling residue)
and clean it, if necessary. Apply a little oil with conductive proper-
ties. See maintenance and care instructions.
Mounting the control unit
Connect to mains voltage according to EN 12453 (all-pole
separating fixture).
Install cable in such a way that it is possible to expand the power
supply in option A (if the cable is at right angles to the C-rail,
install it with a loop).
Position the push button in such a way that the operator can see
the door, while he/she is not inside the operating area of the
door.
Work on the control unit may only be executed if it is de-energised.
Dry any moisture that has penetrated with a blower.
Only qualified electricians may connect the control unit to the mains
supply.
Always install the control unit housing vertically, with the cable channels
downward, without deformation of the housing, so that water cannot
penetrate and so that the lid forms a watertight seal.
Only attach the housing using the intended fixing points, do not drill
through the rear wall of the housing. The housing will leak.
The power cable supplied with the control unit may only be used
for the installation of the drive systems. After completion of the
installation, disconnect the cable and replace it with a duct-laid
cable. It is forbidden to use the supplied power cable for stan-
dard operation of the gate.
22
346
239
6x
361
165
2x M20
6x M16
254
Installation
12
13

Brauchen Sie Hilfe? Stellen Sie Ihre Frage.

Forenregeln

Missbrauch melden von Frage und/oder Antwort

Libble nimmt den Missbrauch seiner Dienste sehr ernst. Wir setzen uns dafür ein, derartige Missbrauchsfälle gemäß den Gesetzen Ihres Heimatlandes zu behandeln. Wenn Sie eine Meldung übermitteln, überprüfen wir Ihre Informationen und ergreifen entsprechende Maßnahmen. Wir melden uns nur dann wieder bei Ihnen, wenn wir weitere Einzelheiten wissen müssen oder weitere Informationen für Sie haben.

Art des Missbrauchs:

Zum Beispiel antisemitische Inhalte, rassistische Inhalte oder Material, das zu einer Gewalttat führen könnte.

Beispielsweise eine Kreditkartennummer, persönliche Identifikationsnummer oder unveröffentlichte Privatadresse. Beachten Sie, dass E-Mail-Adressen und der vollständige Name nicht als private Informationen angesehen werden.

Forenregeln

Um zu sinnvolle Fragen zu kommen halten Sie sich bitte an folgende Spielregeln:

Neu registrieren

Registrieren auf E - Mails für Sommer Marathon Tiga 800 SLX wenn:


Sie erhalten eine E-Mail, um sich für eine oder beide Optionen anzumelden.


Andere Handbücher von Sommer Marathon Tiga 800 SLX

Sommer Marathon Tiga 800 SLX Bedienungsanleitung - Deutsch - 38 seiten

Sommer Marathon Tiga 800 SLX Bedienungsanleitung - Holländisch - 38 seiten


Das Handbuch wird per E-Mail gesendet. Überprüfen Sie ihre E-Mail.

Wenn Sie innerhalb von 15 Minuten keine E-Mail mit dem Handbuch erhalten haben, kann es sein, dass Sie eine falsche E-Mail-Adresse eingegeben haben oder dass Ihr ISP eine maximale Größe eingestellt hat, um E-Mails zu erhalten, die kleiner als die Größe des Handbuchs sind.

Ihre Frage wurde zu diesem Forum hinzugefügt

Möchten Sie eine E-Mail erhalten, wenn neue Antworten und Fragen veröffentlicht werden? Geben Sie bitte Ihre Email-Adresse ein.



Info