2.11 CHIMNEY CONNECTION / CONNECTING PIECES
The Nova E H2O is connected to the chimney with the connecting pieces
made from steel sheet at least 2 mm thick. These connecting pieces
must satisfy the requirements specified in DIN 1298 and DIN EN 1856-
2, and must be connected to the chimney / flue gas system in accord-
ance with the requirements specified in DIN 18160 or the country-specific
regulations. It must be ensured that the flue gas pipe takes the shortest
possible route upwards towards the chimney. The number of bends in the
flue gas pipe should be kept to a minimum. In addition, the flue gas pipe
must be connected to the chimney with a bricked-in wall lining and sealed.
If necessary, the flue gas pipe must be fastened with clamps to ensure
adequate fixation. The connecting pieces must be sealed if necessary! If the
flue gas pipe is routed through components with flammable building materi-
als, the flue gas pipe must be insulated as specified in the regulations. The
connecting line must always be mounted in such a manner that it is possible
to clean the connecting line at any time.This must be ensured through a suf-
ficient number of cleaning openings. A gauge connection must be installed
so that it is accessible for determination of the negative chimney pressure
in the connecting line.
2.12 INSTALLATION OF ROTATING DISC / AIR
ADJUSTMENT LEVER / SERVOMOTOR FOR
S-THERMATIK
After delivery, it may be necessary to mount the rotating disc through the
combustion chamber in the floor area of the tiled stove (e.g. device design
with S-Thermatik). Installation is not executed in the factory because the
star adapter (frictional connection between servomotor and rotating disc),
as well as the servomotor for the S-Thermatik project downwards out of
the device. These components would be damaged through transport and
installation.
For installation, removal of the front combustion chamber chamotte (cha-
motte brick no.: 7 and 8 Fig. 4) and of the combustion chamber floor are
necessary. Installation of the air mechanism must be executed as shown
in Fig. 3a. The air adjustment lever must be in the „closed“ position (air
adjustment lever at the left stop), so that the primary ventilation damper
can be inserted. After installation, the function of the air controller must be
checked before installation of the combustion chamber floor. For this, the
inspection opening in the front chamfer of the combustion chamber bowl
must be opened. Through this opening, it must be possible to determine the
opening of the primary ventilation damper when the air adjustment lever
is in the right position. If the air adjustment lever is turned to the left, the
primary ventilation damper must close.
Star adapter
for frictional
connection
Rotating disc
VA slide plate
Bores for holder of the servomotor
(only for S-Thermatik). The support
of the servomotor is installed through
the large cut-out in the base plate.
Base plate
The bore of the articulated
arm must be fitted on the
bolt of the air adjustment
lever.
Fig. 4
15

Brauchen Sie Hilfe? Stellen Sie Ihre Frage.

Forenregeln

Missbrauch melden von Frage und/oder Antwort

Libble nimmt den Missbrauch seiner Dienste sehr ernst. Wir setzen uns dafür ein, derartige Missbrauchsfälle gemäß den Gesetzen Ihres Heimatlandes zu behandeln. Wenn Sie eine Meldung übermitteln, überprüfen wir Ihre Informationen und ergreifen entsprechende Maßnahmen. Wir melden uns nur dann wieder bei Ihnen, wenn wir weitere Einzelheiten wissen müssen oder weitere Informationen für Sie haben.

Art des Missbrauchs:

Zum Beispiel antisemitische Inhalte, rassistische Inhalte oder Material, das zu einer Gewalttat führen könnte.

Beispielsweise eine Kreditkartennummer, persönliche Identifikationsnummer oder unveröffentlichte Privatadresse. Beachten Sie, dass E-Mail-Adressen und der vollständige Name nicht als private Informationen angesehen werden.

Forenregeln

Um zu sinnvolle Fragen zu kommen halten Sie sich bitte an folgende Spielregeln:

Neu registrieren

Registrieren auf E - Mails für Spartherm Nova E H2O wenn:


Sie erhalten eine E-Mail, um sich für eine oder beide Optionen anzumelden.


Andere Handbücher von Spartherm Nova E H2O

Spartherm Nova E H2O Bedienungsanleitung - Deutsch - 28 seiten

Spartherm Nova E H2O Bedienungsanleitung - Holländisch - 28 seiten


Das Handbuch wird per E-Mail gesendet. Überprüfen Sie ihre E-Mail.

Wenn Sie innerhalb von 15 Minuten keine E-Mail mit dem Handbuch erhalten haben, kann es sein, dass Sie eine falsche E-Mail-Adresse eingegeben haben oder dass Ihr ISP eine maximale Größe eingestellt hat, um E-Mails zu erhalten, die kleiner als die Größe des Handbuchs sind.

Ihre Frage wurde zu diesem Forum hinzugefügt

Möchten Sie eine E-Mail erhalten, wenn neue Antworten und Fragen veröffentlicht werden? Geben Sie bitte Ihre Email-Adresse ein.



Info