809256
60
Zoom out
Zoom in
Vorherige Seite
1/64
Nächste Seite
Fault finding and diagnosis
Greenstar Danesmoor Utility 2022+ and Utility System 2022+ - 6 721 846 263 (2022/01)60
8.9 Oil appliance commissioning checklist
This Commissioning checklist is to be completed in full by the competent
person who commissioned the appliance as a means of demonstrating
compliance with the appropriate Building Regulations and then handed
to the customer to keep for future reference.
IMPORTANT
Leave this manual with the Homeowner.
Appliance details
Appliance make and model:
Appliance serial number:
Commissioning Engineer Commissioning checks
Company name: Oil type used is Kerosene Yes
Company address: Pump pressure PSI
CO2%
CO ppm
CO/CO2 ratio
Telephone number: Smoke reading
Commissioned by (signature) Flue gas temperature °C
(print name) Flue pressure
Commissioning date: Burner model:
Controls: Tick the appropriate boxes
Time and temperature control to heating Room thermostat and programmer/timer Programmable room thermostat
Load/Weather compensation Optimum start control
Time and temperature control hot water Cylinder thermostat and programmer/timer Combination boiler
Heating zone valves Fitted Not required
Hot water zone valves Fitted Not required
Thermostatic radiator valves Fitted Not required
Automatic by-pass valve fitted to system Fitted Not required
Boiler interlock Provided
All Systems
The system has been flushed and cleaned in accordance with BS7593 and appliance manufacturer’s instructions? Yes
What system cleaner was used?
What inhibitor was used? Quantity litres
Has a system filter been fitted? Yes No
The condensate drain has been installed in accordance with the manufacturer’s instructions and/or BS5546/BS6789? Yes
If the condensate pipe terminates externally has the pipe diameter been increased and weatherproof insulation fitted? Yes
Central Heating mode: Measure and record
Central Heating flow temperature °C Central Heating return temperature °C
Domestic Hot Water mode: Measure and record
Combination boilers only
Is the installation in a hard water area (above 200ppm)? Yes No
If yes, has a water scale reducer been fitted? Yes No
What type of scale reducer has been fitted?
Cold Water Inlet temperature °C Hot Water Outlet temperature °C
Water flow rate l/min
All installations
Fire valve fitted rated to 85 °C. Yes
Is the flue damper correctly fitted? Yes No
Are the hoses from the Air pressure switch correctly routed and free from kinking? Yes No
Is a solid non-combustible surface large enough to accommodate the appliance provided? Yes No
Is the oil tank and supply clean and free from contamination? Yes No
Does the installation comply with current OFTEC Regulation? Yes No
The heating and hot water system complies with the appropriate Building Regulations? Yes No
The appliance and associated products have been installed and commissioned in accordance with the manufacturer’s instructions? Yes No
The operation of the appliance and system controls have been demonstrated to and understood by the customer? Yes No
60

Brauchen Sie Hilfe? Stellen Sie Ihre Frage.

Forenregeln

Missbrauch melden von Frage und/oder Antwort

Libble nimmt den Missbrauch seiner Dienste sehr ernst. Wir setzen uns dafür ein, derartige Missbrauchsfälle gemäß den Gesetzen Ihres Heimatlandes zu behandeln. Wenn Sie eine Meldung übermitteln, überprüfen wir Ihre Informationen und ergreifen entsprechende Maßnahmen. Wir melden uns nur dann wieder bei Ihnen, wenn wir weitere Einzelheiten wissen müssen oder weitere Informationen für Sie haben.

Art des Missbrauchs:

Zum Beispiel antisemitische Inhalte, rassistische Inhalte oder Material, das zu einer Gewalttat führen könnte.

Beispielsweise eine Kreditkartennummer, persönliche Identifikationsnummer oder unveröffentlichte Privatadresse. Beachten Sie, dass E-Mail-Adressen und der vollständige Name nicht als private Informationen angesehen werden.

Forenregeln

Um zu sinnvolle Fragen zu kommen halten Sie sich bitte an folgende Spielregeln:

Neu registrieren

Registrieren auf E - Mails für Worcester-Bosch Greenstar Danesmoor Utility Regular - Utility System wenn:


Sie erhalten eine E-Mail, um sich für eine oder beide Optionen anzumelden.


Das Handbuch wird per E-Mail gesendet. Überprüfen Sie ihre E-Mail.

Wenn Sie innerhalb von 15 Minuten keine E-Mail mit dem Handbuch erhalten haben, kann es sein, dass Sie eine falsche E-Mail-Adresse eingegeben haben oder dass Ihr ISP eine maximale Größe eingestellt hat, um E-Mails zu erhalten, die kleiner als die Größe des Handbuchs sind.

Ihre Frage wurde zu diesem Forum hinzugefügt

Möchten Sie eine E-Mail erhalten, wenn neue Antworten und Fragen veröffentlicht werden? Geben Sie bitte Ihre Email-Adresse ein.



Info