626264
8
Zoom out
Zoom in
Vorherige Seite
1/16
Nächste Seite
Chapter Page
Technical data 81.
Fitting the boiler 82.
Mounting a boiler in a cupboard 82:1
Fitting the ue terminal 92:2
LPG Installation 92:3
Fitting the room thermostat 92:4
Electrical installation 92:5
Fitting the heating system 103.
Connection to the heating system 103:1
Filling the heating system 103:2
Connection to hot water heater 114.
Installation inspection 115.
Read through these installation instructions carefully
before tting the boiler. The installation instructions
are approved in accordance with CE no. 048 AO-0007
for LPG boiler type 2928. In connection with follow-up
inspection of the boiler, national regulations must be
followed.
IMPORTANT WARNING!
No unit should be installed in any enclosed space
unless additional permanent ventilation of 100 cm
2
is
provided. No alteration or adjustment should be made
to any gas burner or gas supply by unauthorised or un-
skilled persons. In the event of a failure or breakdown,
turn off the gas supply at the cylinder and contact the
authorised dealer or supplier.
The installation must be carried out in accordance with
the relevant British Standard of Practice. (Particulary
BS5482 Parts 1, 2 and 3).
The Gas Safety Regulations issued by the Dept. of
the Environment, the Building Standards (Scotland)
(Consolidaton) Regulations issued by the Scottich
Develop ment Department.
In any communication it is essential to quote the model
and serial number shown on the data badge.
TECHNICAL DATA1.
Dimensions: Height Width Depth
Boiler dimensions: 1710 mm 132 mm 220 mm
Min. space required: 1850 mm 132 mm 400 mm
With immersion heater: 1850 mm 132 mm 450 mm
With immersion heater
and water heater: 1850 mm 132 mm 480 mm
Gas: Propane Butane
Power: 5,8 kW 6.7 kW
Gas consumption: Max 420 g/h Max 480 g/h
Gas pressure: I
3+
28-30/37 mbar, I
3B/P
30 mbar.
Weight of LPG boiler: 19 kg
Weight of immersion heater: 2.5 kg
(plus 0.5 kg for motor)
Weight of water heater 2959: 4.5 kg
Liquid volume in boiler: 2.6 l
Liquid volume in immersion heater: 1.0 l
FITTING THE BOILER2.
Mark out where the boiler is to stand. If the boiler is
to be positioned against a wall or bulkhead made of a
inammable material, a 1 mm air gap must be allowed.
Make holes in the oor, one for the ventilation duct and
one for the drainage hose (see g 1). The ventilation
duct can be placed either on the right-hand side or the
left-hand side, depending on space available. Cover
the hole for the ventilation duct with ne mesh netting.
Fit the chimney according to chapter 2:2.
Put a strip of realant round where the boiler is to stand.
Position the boiler and screw it in place on the oor
and wall at A g 2.
Remove the square panel on the side boiler where the
ventilation duct is to be tted by pressing the panel out
from inside the boiler casing and cutting the insula-
tion around the aperture with a sharp knife. Uncoil the
overow hose and pass down through the duct and out
through the hole in the oor. Screw the duct to the oor
and the side of the boiler.
If the boiler is tted in a cupboard a partition should be
installed to prevent inammable materials from con-
tacting hot parts of the casing etc. When immersion
or water heaters are tted cut holes in the partition, as
g. 4 for access to the water heater air cock and the
overheat reset button for overheating protection on the
immersion heater.
Fig 1
Hole for ventilation ductA.
Drainage hoseB.
Fig 2
Hole for attaching boilerA.
Fresh airB.
Protection for the exhaust pipeC.
Upper front plateD.
Lower front plateE.
Preheated fresh airF.
Carrying handleG.
Intake hoseH.
Hose clipI.
Drainage hoseJ.
Fig 3
Hole for air screw on water heater type 2959.A.
Hole for drain cock on water heater type 2959.B.
Hole for reset button for overheating protection on C.
immersion heater.
Mounting a boiler in a cupboard2:1
Mark out where the boiler is to stand. An air-space of
1 mm must be left if the boiler is to be placed next to a
wall or anything else that consists of ammable mate-
rial. A door or service hatch should be placed in front of
the boiler so that the control panel and the expansion
tank are easily accessible. The minimum distance in
front of the boiler to any ammable material should be
5 mm. Ventilation areas for the space which the boiler
is to occupy should be at least 10 cm2 at the oor
and the roof. Make holes in the oor, one for the input
8
8

Brauchen Sie Hilfe? Stellen Sie Ihre Frage.

Forenregeln

Missbrauch melden von Frage und/oder Antwort

Libble nimmt den Missbrauch seiner Dienste sehr ernst. Wir setzen uns dafür ein, derartige Missbrauchsfälle gemäß den Gesetzen Ihres Heimatlandes zu behandeln. Wenn Sie eine Meldung übermitteln, überprüfen wir Ihre Informationen und ergreifen entsprechende Maßnahmen. Wir melden uns nur dann wieder bei Ihnen, wenn wir weitere Einzelheiten wissen müssen oder weitere Informationen für Sie haben.

Art des Missbrauchs:

Zum Beispiel antisemitische Inhalte, rassistische Inhalte oder Material, das zu einer Gewalttat führen könnte.

Beispielsweise eine Kreditkartennummer, persönliche Identifikationsnummer oder unveröffentlichte Privatadresse. Beachten Sie, dass E-Mail-Adressen und der vollständige Name nicht als private Informationen angesehen werden.

Forenregeln

Um zu sinnvolle Fragen zu kommen halten Sie sich bitte an folgende Spielregeln:

Neu registrieren

Registrieren auf E - Mails für Alde Comfort 2928 wenn:


Sie erhalten eine E-Mail, um sich für eine oder beide Optionen anzumelden.


Andere Handbücher von Alde Comfort 2928

Alde Comfort 2928 Bedienungsanleitung - Deutsch, Englisch, Holländisch, Französisch, Schwedisch, Finnisch - 32 seiten


Das Handbuch wird per E-Mail gesendet. Überprüfen Sie ihre E-Mail.

Wenn Sie innerhalb von 15 Minuten keine E-Mail mit dem Handbuch erhalten haben, kann es sein, dass Sie eine falsche E-Mail-Adresse eingegeben haben oder dass Ihr ISP eine maximale Größe eingestellt hat, um E-Mails zu erhalten, die kleiner als die Größe des Handbuchs sind.

Ihre Frage wurde zu diesem Forum hinzugefügt

Möchten Sie eine E-Mail erhalten, wenn neue Antworten und Fragen veröffentlicht werden? Geben Sie bitte Ihre Email-Adresse ein.



Info