3.3.1 C11, wall terminal
For a facade or wall outlet use a wall terminal (see g. 1.0 C11).
Depending on the calculation this can be a diameter of 130/200mm
or 100/150mm.
3.3.2 C31, roof terminal
For a at or pits roof outlet use a long roof outlet with a diameter of
100/150mm (see g. 1.0 C31)
3.3.3 C91, existing chimney
You can also connect to an existing replace chimney. The existing
chimney functions then as air supply and a exible stainless steel
tube drawn through the chimney carries the ue gases. The exible
stainless steel tube of Ø100mm must have a CE mark have up to
600°C.
Use the short chimney outlet. (See g. 1.0 C91).
The chimney must have the following conditions:
The channel of the chimney must be at least 150x150mm.
There should be no more than one device on a chimney.
The chimney must be in good condition:
o No leakage
o Well cleaned
For more information about connections to existing chimneys, ask
the installation manual “chimney connection set”.
4 Preparation and installation
instructions
4.1 Gas connection
The gas connection must comply with the applicable local
standards. We advise using a Ø15mm gas connection directly from
the gas meter to the appliance, with a shut-off valve in the proximity
of the appliance, which must always be freely accessible. Position
the gas connection so that it is easily accessible at all times for
service and that the burner unit can be disassembled. (See g.
8.0-C and dimensional drawing 16.2 for position of the gas
connection).
4.2 Electrical connection
The power supply must comply with the applicable local standards.
A wall socket 230VAC/50Hz must be installed near the re. For
power supply make use of the included plug adapter. See g 2.0 for
the wiring diagram of this connection and the LED Symbio module.
A = Plug adapter 6V
B = Micro switch
C = Spark transformer
D = LED Symbio module
E = Slider
4.3 Preparing the re
Remove the re from its packaging. Open the operation door
(see g. 3.0), take the packaged parts from the re and
remove the bolts in the bottom plate.
Prepare the gas connection on the regulator. See g. 8.0-C
and dimensional drawing 16.2.
4.4 Positioning the re
Take into account the installation requirements and the minimum
distances around the replace. (See Chapter 3).
4.5 Installing the ue materials
When penetrating a non-combustible wall or ceiling the
opening must be at least 5mm larger than the diameter of the
discharge material. At a combustible wall or ceiling is this
100mm larger than the diameter of the drainage material.
Horizontal sections should be installed with a slope towards
the re (3 degrees).
Build the system from the re. If this is not possible you can
make use of an extendable adapter section.
For truing up the exhaust system use the 0,5m. pipe, which
can be shortened and ensure that the inner pipe is always
2cm longer than the outer pipe.
Parts, which are shortened, must be secured with a
self-tapping screw.
Wall and roof terminals can also be cut.
Do not insulate but ventilate built-in ue material (approx.
100cm²).
5 Removing the glass
5.1 Front glass
Remove the front frame. See g. 4.0.
Slightly loose the screws of the glass support under.
See g. 4.1.
Slightly loose the nuts of the upper glass support and remove
it. See g. 4.2.
Remove the front glass. See g. 4.3.
For replacing the front glass repeat the steps in reverse
order.
> Please note:
Clean all ngerprints on the glass; otherwise they will burn in once
the re is used.
5.2 Side glasses
For cleaning only it’s not necessary to remove the side glasses.
Only remove the front glass. See Chapter 5.1.
Remove the side panel. See g. 5.0.
Slightly loose the screws of the glass support under.
See g. 5.1.
Slightly loose the nuts of the upper glass support and
remove it. See g. 5.2.
Remove the side glass. See g. 5.3.
> Please note:
Clean all ngerprints on the glass; otherwise they will burn in once
the re is used.
9

Brauchen Sie Hilfe? Stellen Sie Ihre Frage.

Forenregeln

Missbrauch melden von Frage und/oder Antwort

Libble nimmt den Missbrauch seiner Dienste sehr ernst. Wir setzen uns dafür ein, derartige Missbrauchsfälle gemäß den Gesetzen Ihres Heimatlandes zu behandeln. Wenn Sie eine Meldung übermitteln, überprüfen wir Ihre Informationen und ergreifen entsprechende Maßnahmen. Wir melden uns nur dann wieder bei Ihnen, wenn wir weitere Einzelheiten wissen müssen oder weitere Informationen für Sie haben.

Art des Missbrauchs:

Zum Beispiel antisemitische Inhalte, rassistische Inhalte oder Material, das zu einer Gewalttat führen könnte.

Beispielsweise eine Kreditkartennummer, persönliche Identifikationsnummer oder unveröffentlichte Privatadresse. Beachten Sie, dass E-Mail-Adressen und der vollständige Name nicht als private Informationen angesehen werden.

Forenregeln

Um zu sinnvolle Fragen zu kommen halten Sie sich bitte an folgende Spielregeln:

Neu registrieren

Registrieren auf E - Mails für Faber Vejen wenn:


Sie erhalten eine E-Mail, um sich für eine oder beide Optionen anzumelden.


Andere Handbücher von Faber Vejen

Faber Vejen Installationsanweisung - Deutsch - 28 seiten

Faber Vejen Installationsanweisung - Holländisch - 24 seiten

Faber Vejen Installationsanweisung - Französisch - 24 seiten


Das Handbuch wird per E-Mail gesendet. Überprüfen Sie ihre E-Mail.

Wenn Sie innerhalb von 15 Minuten keine E-Mail mit dem Handbuch erhalten haben, kann es sein, dass Sie eine falsche E-Mail-Adresse eingegeben haben oder dass Ihr ISP eine maximale Größe eingestellt hat, um E-Mails zu erhalten, die kleiner als die Größe des Handbuchs sind.

Ihre Frage wurde zu diesem Forum hinzugefügt

Möchten Sie eine E-Mail erhalten, wenn neue Antworten und Fragen veröffentlicht werden? Geben Sie bitte Ihre Email-Adresse ein.



Info